
ELLEVATION AT NORTH HARBOUR
16 Brand-New Architect-Designed Industrial Units
from $615,000 + GST
Above-container roller doors. Oversized mezzanine clearance. Dedicated on-site transformer. Tilt-panel construction underway, completion anticipated Q2 2026.
14 of 16 units available- 2 units under offer. Practical completion in weeks.
See the 14 units →16 Units
Architect-Designed
138 – 270 m²
Warehouse + Mezzanine
$615K+
ex-GST
Q2 2026
Completion
50 Car Parks
On-Site
Bruce Hwy
500m off Exit 150
North Harbour Business Park is the newest development offering all types of businesses a rare opportunity to secure state-of-the-art industrial units in one of Queensland's fastest-growing regions. Located within the thriving Moreton Bay City area, the North Harbour master-planned community will include unrivalled amenities — a shopping centre and bulky-goods precinct, small shops, fast food and fuel stations, a pub or tavern, and fitness or gym operators within close proximity.
Key features
- ▸Oversized mezzanine clearance — store caravans, boats and oversized equipment underneath (up to 3m)
- ▸Electric roller doors above standard container height — normally seen on medium to larger industrial applications
- ▸Dedicated on-site transformer with enhanced 3-phase power to every unit — no other development in the Business Park offers this
- ▸Interior designed by PJ Design Group with named-brand fixtures throughout
- ▸Half-landing staircases to mezzanine — commercial-grade access, not a steep ladder
- ▸138 m² to 270 m² warehouse + mezzanine units — MIBA zoned
- ▸Strong access and egress crossovers, container loading, 50 on-site car parks
- ▸Architecturally designed by Parups Waring Architects (Denis Waring FRAIA)
- ▸NBN connected, full fire safety, end-of-trip facilities (bathrooms + showers)
- ▸Construction underway — completion anticipated Q2 2026

The Height Advantage
Most small-format industrial mezzanines provide for 2.4m to 2.7m clearance underneath — enough for shelving and smaller items. Ellevation's mezzanine levels are deliberately designed with oversized clearance beneath — enough to comfortably store caravans, boats and oversized equipment up to 3m. Electric roller doors exceed standard container height, allowing trucks and large vehicles to freely access every unit.
Each unit features a half-landing staircase to the mezzanine — a proper commercial-grade stairwell with a mid-level landing, not a steep straight-flight or a ladder. It's a detail that matters when you're moving stock or equipment between levels daily.
Site plan
Click any unit to view it
The 16 Units
Ground-floor + mezzanine. Click a unit for full details.
Unit 1
Marquee corner
269.5 m² total
197 m² ground, 72.5 m² mezz
$1,215,000 + GST
AvailableUnit 2
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 3
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 4
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 5
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 6
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 7
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
Under OfferUnit 8
173 m² total
123 m² ground, 50 m² mezz
Under Offer
AvailableUnit 9
178 m² total
126 m² ground, 52 m² mezz
$775,000 + GST
AvailableUnit 10
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 11
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
Under OfferUnit 12
137.5 m² total
95 m² ground, 42.5 m² mezz
Under Offer
AvailableUnit 13
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 14
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 15
137.5 m² total
95 m² ground, 42.5 m² mezz
$615,000 + GST
AvailableUnit 16
Marquee corner
269.5 m² total
197 m² ground, 72.5 m² mezz
$1,215,000 + GST
Watch us build
Real photos. Real progress. Practical completion June 2026.

Oct 2025
Slab pour

Nov 2025
Slab + precast

Jan 2026
Frame up

Mar 2026
Cladding

Apr 2026
Fitout

May 2026
Near complete
Inside the build
Site visits - fit and finish








Marquee Corner Units - 1 & 16
270 m² each with full-height glass frontages - genuine showroom-grade presentation. Drop ceilings, ducted A/C, dual kitchenette + bathroom on **both** ground and mezzanine. A completely different product for businesses that need client-facing street presence with warehouse behind it.
Industrial Supply Is Tightening
Industrial supply across South East Queensland is tightening. Brendale, North Lakes and Clontarf are all running at low vacancy, and major new precincts in the Caboolture corridor are still 2-3 years from delivery.
Ellevation is 16 architect-designed units in one of the fastest-growing pockets of the Moreton Bay region - purpose-built and finished to a higher spec than the typical industrial stock available today.
Power & Infrastructure
Every unit receives 3-phase power from an exclusive on-site transformer - no other development in the Business Park offers this level of power supply. NBN connected. Full fire safety systems. End-of-trip facilities (bathrooms and showers).
Interior-Designed, Not Builder-Basic
Professionally specified interiors by PJ Design Group with named-brand fixtures, tiles and cabinetry throughout. These quality finishes are more aligned with those found in high-end commercial office space than typical industrial fit-out.
Built for How You Actually Work
- ▸Container loading zone
- ▸Drive-in, drive-out truck access
- ▸50 on-site car parks - exclusive + visitor + accessible
- ▸MIBA zoning - permits warehouse, showroom, trade, light industrial, and storage uses
- ▸Kitchenette + ambulant-compliant amenities in every unit (marquee corners get them on both levels)
- ▸Master-planned community delivering retail, food, gym and services within walking distance
Location
68 Boreas Drive, Morayfield QLD 4506
| Destination | Time | Distance |
|---|---|---|
| Bruce Highway (Exit 150) | 1 min | 500 m |
| Sunshine Coast CBD | 38 mins | 60.5 km |
| Brisbane Airport | 34 mins | 43.8 km |
| Port of Brisbane | 47 mins | 58.3 km |
| Brisbane CBD | 60 mins | 43.4 km |
| Gold Coast | 1 hr 56 mins | 125 km |
Located within the thriving Moreton Bay City area in one of Queensland's fastest-growing regions.
535,000
Population (2025)
$24 Billion
Gross Regional Product
136,900
People Employed
3rd largest LGA
in Australia, 5th fastest-growing
The Marketing Team
60+ years combined Queensland industrial experience.
Chris Massie
RWC Northern Corridor Group
0412 490 840
chris.massie@raywhite.com
James Garnett
RWC Northern Corridor Group
0422 087 745
james.garnett@raywhite.com
Mark Horgan
Integrated Property Partners
0411 180 277
mark.horgan@integratedproperty.com.au
David McPhillips
Integrated Property Partners
0421 087 127
david.mcphillips@integratedproperty.com.au
Register Interest
Tell us a little about what you're after. We'll be in touch within one business day.
16 units. Construction underway. Completion anticipated Q2 2026. Units from $615,000 + GST. 138m² to 270m². Contact the exclusive agents for the full schedule of units and pricing.