
ELLEVATION AT NORTH HARBOUR
Unit 2 — 137.5 m² Architect-Designed Industrial Unit
$615,000 + GST
($676,500 inc-GST)
95 m²
Ground Floor
42.5 m²
Mezzanine
137.5 m²
Total Area
Q2 2026
Completion
Why Ellevation
- ▸Oversized mezzanine clearance — store caravans, boats, oversized equipment underneath (up to 3m)
- ▸Electric roller doors above standard container height — normally seen on medium to larger industrial applications
- ▸Dedicated on-site transformer with enhanced 3-phase power to every unit — no other development in the Business Park offers this
- ▸Interior designed by PJ Design Group with named-brand fixtures throughout
- ▸Half-landing staircases to mezzanine — commercial-grade, not steep ladder access
- ▸138 m² to 270 m² warehouse + mezzanine units — MIBA zoned
Inside the Unit




The Height Advantage
Most small-format industrial mezzanines provide for 2.4m–2.7m clearance underneath — enough for shelving and smaller items. Ellevation's mezzanine levels are deliberately designed with oversized clearance beneath — enough to comfortably store caravans, boats and oversized equipment up to 3m. Electric roller doors exceed standard container height, allowing trucks and large vehicles to freely access every unit.
Each unit features a half-landing staircase to the mezzanine — a proper commercial-grade stairwell with a mid-level landing, not a steep straight-flight or ladder. It's a detail that matters when you're moving stock or equipment between levels daily.
Power & Infrastructure
Every unit receives 3-phase power from an exclusive on-site transformer — no other development in the Business Park offers this level of power supply. NBN connected. Full fire safety systems. End-of-trip facilities (bathrooms and showers).
Interior-Designed
Professionally specified interiors by PJ Design Group with named-brand fixtures, tiles and cabinetry throughout. These quality finishes are more aligned with those found in high-end commercial office space than typical industrial fit-out.
Location
68 Boreas Drive, Morayfield QLD 4506
| Destination | Time | Distance |
|---|---|---|
| Bruce Highway (Exit 150) | 1 min | 500 m |
| Sunshine Coast CBD | 38 mins | 60.5 km |
| Brisbane Airport | 34 mins | 43.8 km |
| Port of Brisbane | 47 mins | 58.3 km |
| Brisbane CBD | 60 mins | 43.4 km |
| Gold Coast | 1 hr 56 mins | 125 km |
Marketing Team
60+ years combined Queensland industrial experience.
Chris Massie
RWC Northern Corridor Group
0412 490 840
chris.massie@raywhite.com
James Garnett
RWC Northern Corridor Group
0422 087 745
james.garnett@raywhite.com
Mark Horgan
Integrated Property Partners
0411 180 277
mark.horgan@integratedproperty.com.au
David McPhillips
Integrated Property Partners
0421 087 127
david.mcphillips@integratedproperty.com.au
Reserve Unit 2
Owner-occupiers — book a site inspection. Investors — request the IM with rental evidence and depreciation estimates.
16 units. Construction underway. Completion anticipated Q2 2026. Units from $615,000 + GST · 138m² to 270m² · Contact the exclusive agents for the full schedule of units and pricing.