
NOW LEASING AT ELLEVATION NORTH HARBOUR
Lease a Brand-New Architect-Designed Industrial Unit in Morayfield. 138 to 270 m². Move-in Q2 2026.
Brand-new tilt-panel industrial units in Moreton Bay City's newest business park. Three-phase power on a dedicated transformer, container loading, mezzanine clearance, end-of-trip facilities. 500m from Bruce Highway Exit 150.
14 of 16 units available- 2 units under offer. Practical completion in weeks.
See the 14 units →16 Units
Architect-Designed
138 – 270 m²
Warehouse + Mezzanine
$615K+
ex-GST
Q2 2026
Completion
50 Car Parks
On-Site
Bruce Hwy
500m off Exit 150
Watch us build
Real photos. Real progress. Practical completion June 2026.

Oct 2025
Slab pour

Nov 2025
Slab + precast

Jan 2026
Frame up

Mar 2026
Cladding

Apr 2026
Fitout

May 2026
Near complete
What you get
The hard specs. Every feature is on every unit unless explicitly noted.
- ✓Three-phase power on a dedicated on-site transformer — no other building in the park has one
- ✓Above-container roller doors — full truck access on every unit
- ✓Oversized mezzanine clearance — store stock, tools, or set up a workshop loft
- ✓Half-landing staircase — proper commercial-grade access, not a steep ladder
- ✓End-of-trip facilities (bathrooms + showers) on every floor
- ✓Showroom-capable glass frontages on the marquee corner units
- ✓50 on-site car parks across the development
Inside the unit
Drop ceilings, half-landing staircase, kitchenette and ambulant-compliant amenities in every unit. Interior designed by PJ Design Group with named-brand fixtures throughout.




Who it fits
Long-term leases welcome. Talk to the leasing team about your operational fit.
- Trades and workshops (cabinet, joinery, auto, print, sign)
- Light manufacturing and food production
- Logistics, distribution, importers
- Mobile-service operators needing a base + storage
- Crews of 2–10 scaling out of a smaller unit
How leasing works
Four steps from enquiry to keys. Clear timeline, no surprises.
- 01
Get in touch
Tell us about your business and required move-in timing. We respond within one business day.
- 02
Inspect
Walk the building with the marketing agents. Floor plans, configuration options, ready-for-fitout state.
- 03
Sign your lease
Heads of agreement, then formal lease. Standard commercial terms, ABN required.
- 04
Move in
Move-in on practical completion (anticipated Q2 2026). Fit-out and occupation can begin.
Architecture
Parups Waring Architects
Denis Waring FRAIA
Interior Design
PJ Design Group
Named-brand fixtures throughout
Marketing Agents
RWC Northern Corridor
& Integrated Property Partners
Construction
Underway since Oct 2025
Practical completion Q2 2026
Enquire about leasing
Tell us what kind of space you need and when you're looking to move in.
The leasing team
60+ years combined Queensland industrial experience.
Chris Massie
RWC Northern Corridor Group
0412 490 840
chris.massie@raywhite.com
James Garnett
RWC Northern Corridor Group
0422 087 745
james.garnett@raywhite.com
Mark Horgan
Integrated Property Partners
0411 180 277
mark.horgan@integratedproperty.com.au
David McPhillips
Integrated Property Partners
0421 087 127
david.mcphillips@integratedproperty.com.au
68 Boreas Drive, Morayfield QLD 4506 (Lot 22, 68 Boreas Drive, Burpengary East QLD 4505).